Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

19/12/1895

The year in which a vessel’s construction is completed.

Year of ship completion

1893

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

John Fullerton & Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Paisley

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Report of Total Loss, Casualty, &c./ Wreck reports

The individual and/or organisation listed

Ship owner

Wallace Bros

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1

Recorded information related to a vessel’s movements.

Voyage information

Crosby Light

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Is the steamer assisted by sail?

Sail assisted steamer

No

A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.

Under Deck Tonnage

286

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Compound engines, 2 cylinder

Engine builder as written

Ross & Duncan

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by collision off Crosby Light

Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.

Registered Beam

25.2

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Ringsend

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

29/09/1893

Unique identifier for a given ship, it is assigned by a builder.

Yard no

117

A unique number allocated to a specific vessel by an official registration authority of the country of registry (flag) that the vessel belongs to (post. 1855).

Official number

99750

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

R Lewis

The name of the port/place from which a vessel’s voyage originated.

Voyage from

Garston

The name of the port/place of destination given.

Destined voyage

Dublin

A vessel’s means of propulsion.

Propulsion

Steam

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

396

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Net Register Tonnage

157

Location of construction for a vessel’s engines.

Location of engine build

Glasgow

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.

Horsepower nominal

73

Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.

Registered Length

142.2

Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.

Registered Depth

11.4

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.