Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
19/12/1895
The year in which a vessel’s construction is completed.
1881
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Palmers Shipbuilding & Iron Co Ltd
The name of the yard where the vessel was built.
Jarrow
A unique number allocated to a specific vessel by an official registration authority of the country of registry (flag) that the vessel belongs to (post. 1855).
85089
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Dent & Co
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Is the steamer assisted by sail?
No
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
2606
Type and configuration of the engine(s) supplied for a vessel.
Compound engines, 2 cylinder
Palmers Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
Wrecked
Vessel’s place of loss or disposal/last known recorded location.
Cape Wrath & Faroe Islands
Recorded date for the vessel’s loss or disposal.
20/11/1895
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
39.2
Physical extent of a record.
1
Name of ship as recorded on the record
Principia
The process of transferring a vessel to water, but not necessarily her completion.
08/11/1881
Unique identifier for a given ship, it is assigned by a builder.
448
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Total Loss, Casualty, &c./ Wreck reports
The individual and/or organisation listed
Arrow Shipping Co
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
R B Stannard
Recorded information related to a vessel’s movements.
Cape Wrath; Faroe Islands
A vessel’s means of propulsion.
Steam
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2749
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
1790
Location of construction for a vessel’s engines.
Newcastle
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.
269
Contextual information related to the reasons of the vessel’s loss or disposal.
Wrecked after fire when 140 miles north of Cape Wrath and was put before the wind, following day struck on a rock near Faroe Isles and sank
Vessel’s area of loss or disposal/last known recorded location.
Between Norwegian Sea and North Atlantic
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
316.7
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
26.7
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.