Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
09/09/1926
The year in which a vessel’s construction is completed.
1899
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
John Readhead & Sons
The name of the yard where the vessel was built.
West Yard
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Total Loss, Casualty, &c./ Wreck reports
The individual and/or organisation listed
Sociedad Nacional de Buques y Maderas
Recorded information related to a vessel’s movements.
Valparaiso
A vessel’s means of propulsion.
Steam
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3566
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
2296
Location of construction for a vessel’s engines.
South Shields
J Readhead & Sons
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
341
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
26
Name of ship as recorded on the record
Trevessa
The process of transferring a vessel to water, but not necessarily her completion.
06/09/1899
Unique identifier for a given ship, it is assigned by a builder.
342
The port or place in which the vessel’s construction took place, at the time of writing.
South Shields
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
7522
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 with freeboard 4,25
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Is the steamer assisted by sail?
No
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
3354
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion 3 Cylinder
Date in which construction of a vessel’s engines were completed.
1899/__/__
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.
293
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
46.7
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.