Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
25/08/1923
The process of transferring a vessel to water, but not necessarily her completion.
21/09/1900
Unique identifier for a given ship, it is assigned by a builder.
256
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Total Loss, Casualty, &c./ Wreck reports
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 1.32 SS 2nd no3 5.26 ss no1.30; in red BS 7.31 +LMC 7.30
A vessel’s means of propulsion.
Steam
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3672
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
2357
Location of construction for a vessel’s engines.
Glasgow
Dunsmuir & Jackson Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
355.1
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
25.8
The year in which a vessel’s construction is completed.
1900
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Charles Connell & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow
Additional numbers that feature on a given record that may be used for identification.
8321
The individual and/or organisation listed
P M Poutosus
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Is the steamer assisted by sail?
No
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
3412
Type and configuration of the engine(s) supplied for a vessel.
Triple expansion engine, 3 cylinders
Date in which construction of a vessel’s engines were completed.
1900/__/__
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.
353
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
45
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.