Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

__/__/0000

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

15/01/1869

Unique identifier for a given ship, it is assigned by a builder.

Yard no

123

The country in which the vessel’s construction took place, at the time of writing.

Country of build

United Kingdom

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

A vessel’s means of propulsion.

Propulsion

Sail

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

2309

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Net Register Tonnage

2131

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.

Registered Length

300.5

Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.

Registered Depth

24.7

The year in which a vessel’s construction is completed.

Year of ship completion

1869

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

A Stephen & Sons

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Glasgow

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Newspaper clipping

The individual and/or organisation listed

Ship owner

Cie Francaise d'Armement et d'Importation de Nitrate de Soude

Physical arrangement of a ship’s masts, sails and rigging.

Rig

Bk - Barque

Is the steamer assisted by sail?

Sail assisted steamer

No

A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.

Under Deck Tonnage

2189

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Recorded information relating the specific cargo being conveyed.

Cargo

coal

Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.

Registered Beam

42

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.