Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
07/11/1892
The year in which a vessel’s construction is completed.
1871
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Caird & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Greenock
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Total Loss, Casualty, &c./ Wreck reports
The individual and/or organisation listed
A Echevarria
Recorded information related to a vessel’s movements.
Mazatlan
A vessel’s means of propulsion.
Steam
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
353
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
192
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
1
Name of ship as recorded on the record
Ananda
The process of transferring a vessel to water, but not necessarily her completion.
04/11/1871
Unique identifier for a given ship, it is assigned by a builder.
165
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Wrecked 6.92
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Is the steamer assisted by sail?
No
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
345
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Recorded information relating the specific cargo being conveyed.
coffee
Pertinent, useful or interesting recorded content.
Her stern cable broke and the ship turned on the bow anchor and struck on a rock, submerging the stern. According to the newspaper cuttings, 400 bags coffee in hold under water, 200 will come out damaged and 200 dry. She was then reported total loss. Her name is spelled as Guadalope and Guadalupe.
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.