Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

07/04/1930

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

30/10/1882

Unique identifier for a given ship, it is assigned by a builder.

Yard no

1156

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

London

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Antwep 16976

The individual and/or organisation listed

Ship owner

L Hermans

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Is the steamer assisted by sail?

Sail assisted steamer

No

A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.

Under Deck Tonnage

307

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Compound 2 Cylinders

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.

Horsepower nominal

1319

Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.

Registered Beam

24

Physical extent of a record.

Number of parts

1

The year in which a vessel’s construction is completed.

Year of ship completion

1882

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Forrest & Sons

The name of the yard where the vessel was built.

Yard name

Britannia Yard

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Memo

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

Name of the individual/entity/organisation responsible for authoring the record

Document author

S R Davies

A vessel’s means of propulsion.

Propulsion

Steam

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Gross Register Tonnage (NM)

440

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Net Register Tonnage

260

Engine builder as written

R H Pearsons, Glasgow

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.

Registered Length

159.6

Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.

Registered Depth

12.2

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.