Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
28/01/1925
The year in which a vessel’s construction is completed.
1880
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
MacIlwaine & Lewis
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Survey for Repairs, &c.
The date of first visit by a surveyor.
20/08/1924
The individual and/or organisation listed
Cliffburn Steamship Co Ltd
Location where the document is written.
Leith
Location where a vessel’s survey was undertaken.
Leith
The name of the port/place from which a vessel’s voyage originated.
Leith
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Is the steamer assisted by sail?
No
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
244
Type and configuration of the engine(s) supplied for a vessel.
Compound engine, two cylinders
McIlwaine & Lewis
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
1
Name of ship as recorded on the record
Parkmore
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1880
Unique identifier for a given ship, it is assigned by a builder.
10
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
16656
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
27/01/1925
Name of the individual/entity/organisation responsible for authoring the record
Robert Cheetham
Name of surveyor.
Robert Cheetham
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Deferred for repairs
The name of the port/place of destination given.
Laid up
A vessel’s means of propulsion.
Steam
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
274
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
197
Location of construction for a vessel’s engines.
Belfast
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.
50
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.