Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

05/06/1929

The year in which a vessel’s construction is completed.

Year of ship completion

1883

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Edwards, Sons & Craig

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Memo

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

E B Borjesson

A vessel’s means of propulsion.

Propulsion

Steam

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Gross Register Tonnage (NM)

1549

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Net Register Tonnage

878

Engine builder as written

Blair & Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.

Registered Length

260

Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.

Registered Depth

18.7

Name of ship as recorded on the record

Ship name

Addington

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/__/1883

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Newcastle

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Helsingborg 325

The individual and/or organisation listed

Ship owner

Rederi A/B Botte

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Is the steamer assisted by sail?

Sail assisted steamer

No

A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.

Under Deck Tonnage

1274

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Compound 2 Cylinders

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.

Horsepower nominal

167

Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.

Registered Beam

36.1

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.