Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
22/05/1869
The year in which a vessel’s construction is completed.
1869
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Wexford Dock Yard Co
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Wex
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
No title
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
Name of the individual/entity/organisation responsible for authoring the record
Robert Sparrow
Location where a vessel’s survey was undertaken.
Wexford
Date of the meeting of the Classing Committee.
25/05/1869
The name of the port/place of destination given.
Coaster
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Wood
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Mermaid
The process of transferring a vessel to water, but not necessarily her completion.
12/05/1869
The port or place in which the vessel’s construction took place, at the time of writing.
Wexford
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
412
The listed port to which a given vessel belongs.
Wexford
The individual and/or organisation listed
Wexford Dock Yard Co
Location where the document is written.
Wexford
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 for 5 Years; A & CP From 1869
Recorded information related to a vessel’s movements.
Wexford; Coaster
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.