Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
04/04/1848
The year in which a vessel’s construction is completed.
1845
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Wex
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
No title
The listed port to which a given vessel belongs.
Bideford
The individual and/or organisation listed
William Lee & Co
Location where the document is written.
Wexford
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
10A1; Record Damgd Repd
Recorded information related to a vessel’s movements.
Wexford; Glocester
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Eliza & Ann
The port or place in which the vessel’s construction took place, at the time of writing.
Bideford
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
128
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Bideford 326; Bideford 350
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
Name of the individual/entity/organisation responsible for authoring the record
Mark Devereux
Location where a vessel’s survey was undertaken.
Wexford
Date of the meeting of the Classing Committee.
20/06/1848
The name of the port/place of destination given.
Glocester
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Wood
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
58
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.