Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
04/06/1907
The year in which a vessel’s construction is completed.
1907
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
John Readhead & Sons
Unique identifier for a given ship, it is assigned by a builder.
401
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
04/06/1907
Name of the individual/entity/organisation responsible for authoring the record
W Lane
Location where a vessel’s survey was undertaken.
South Shields
Date of the meeting of the Classing Committee.
14/06/1907
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3628
Location of construction for a vessel’s engines.
South Shields
John Readhead & Sons
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Vessel’s area of loss or disposal/last known recorded location.
West of Ireland
Physical extent of a record.
1
Name of ship as recorded on the record
Dan
The process of transferring a vessel to water, but not necessarily her completion.
30/04/1907
Name of the shipbuilder as it appears on the record.
John Readhead & Sons
The port or place in which the vessel’s construction took place, at the time of writing.
South Shields
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
53068
The listed port to which a given vessel belongs.
Dubrovnik
The date of first visit by a surveyor.
15/11/1906
The individual and/or organisation listed
Giovanni Racich & Partners
Location where the document is written.
Newcastle
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 6,07
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Compound
Date in which construction of a vessel’s engines were completed.
1907
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine
Recorded date for the vessel’s loss or disposal.
25/08/1940
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.