Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
27/09/1924
The year in which a vessel’s construction is completed.
1924
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Doxford & Sons Ltd
Unique identifier for a given ship, it is assigned by a builder.
582
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
24/09/1924
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
W Runciman & Co
Location where the document is written.
Sunderland
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1 with fbd; Lloyd\'s A & CP; +LMC 9,24; CL; Oil Engines
Recorded information related to a vessel’s movements.
Sunderland; North Pacific
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Motor Vessel
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine
Recorded date for the vessel’s loss or disposal.
26/07/1940
Name of ship as recorded on the record
Vinemoor
The process of transferring a vessel to water, but not necessarily her completion.
30/07/1924
Name of the shipbuilder as it appears on the record.
H Gallacher
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
28918
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
31/03/1924
The individual and/or organisation listed
Moor Line Ltd
Name of the individual/entity/organisation responsible for authoring the record
A Pickworth
Location where a vessel’s survey was undertaken.
Sunderland
Date of the meeting of the Classing Committee.
10/10/1924
The name of the port/place of destination given.
North Pacific
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4369
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Vessel’s area of loss or disposal/last known recorded location.
Atlantic
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.