26/09/1917

The year in which a vessel’s construction is completed.

Year of ship completion

1916

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

The North of Ireland Shipbuilding Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Londonderry

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

16381

The port in which a vessel is registered or permanently based.

Port of registry

Liverpool

The date of first visit by a surveyor.

Date of first survey

23/09/1917

The individual and/or organisation listed

Ship owner

Henry Tyrer & Co

Name of the individual/entity/organisation responsible for authoring the record

Document author

Frederick Stephens

Location where a vessel’s survey was undertaken.

Location of Survey

Barry

Date of the meeting of the Classing Committee.

Date of Classing committee

05/10/1917

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Sunderland

Engine builder as written

MacColl & Pollock Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Eskmere

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

10/04/1916

Unique identifier for a given ship, it is assigned by a builder.

Yard no

66

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Bry

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Survey for Repairs, &c., of Engines & Boilers

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

23/09/1917

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Henry Tyrer & Co

Location where the document is written.

Location of Document Creation

Barry

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 7,16; +LMC 6,16

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

2293

Date in which construction of a vessel’s engines were completed.

Year of engine build

1916

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1