Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
27/10/1915
The year in which a vessel’s construction is completed.
1906
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Swan Hunter & Wigham Richardson Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
3323
The port in which a vessel is registered or permanently based.
London
The date of first visit by a surveyor.
01/10/1915
The individual and/or organisation listed
Eftikhia Steamship Co Ltd
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
A Bowling
Location where the document is written.
Queenstown
Location where a vessel’s survey was undertaken.
Cork; Passage
Date of the meeting of the Classing Committee.
02/11/1915
The name of the port/place of destination given.
Barry; Cardiff
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Newcastle
North Eastern Marine Engineering Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Enosis
The process of transferring a vessel to water, but not necessarily her completion.
10/01/1906
Unique identifier for a given ship, it is assigned by a builder.
757
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Qns
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
14/10/1915
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
R Wigham Richardson & Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
Herbert W Dove
Name of surveyor.
Herbert W Dove
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 5,15; SS Nwc No 2-14; +LMC 3,14; BS 5,15; TS 3,14
Recorded information related to a vessel’s movements.
Cork; Passage; Barry; Cardiff
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3409
Date in which construction of a vessel’s engines were completed.
1906
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.