Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1902
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Alexander Stephen & Sons Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
20006
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
Location where the document is written.
Glasgow
Location where a vessel’s survey was undertaken.
Glasgow
Date of the meeting of the Classing Committee.
02/07/1902
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
1
Name of ship as recorded on the record
Tarquah
The process of transferring a vessel to water, but not necessarily her completion.
23/04/1902
Unique identifier for a given ship, it is assigned by a builder.
395
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Name of the individual/entity/organisation responsible for authoring the record
A McKeand
Name of surveyor.
A McKeand
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Accompanying report
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
0000
Have you noticed missing or incorrect data or images for this document?