Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
21/02/1905
The year in which a vessel’s construction is completed.
1905
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Dublin Dockyard Co
Unique identifier for a given ship, it is assigned by a builder.
46
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Dub
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Iron or Steel Steamer
The listed port to which a given vessel belongs.
Dublin
The date of first visit by a surveyor.
27/06/1904
The individual and/or organisation listed
J T Harrison
Location where the document is written.
Dublin
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 (steel); Lloyds A & CP; +LMC 2,05
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
2
Name of ship as recorded on the record
Lillebonne
The process of transferring a vessel to water, but not necessarily her completion.
09/01/1905
Name of the shipbuilder as it appears on the record.
Walter Scott
The port or place in which the vessel’s construction took place, at the time of writing.
Dublin
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
2337
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Glasgow 22552
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
24/01/1905
Name of the individual/entity/organisation responsible for authoring the record
John MacWilliam
Location where a vessel’s survey was undertaken.
Dublin
Date of the meeting of the Classing Committee.
03/05/1905
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1017
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No