Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
27/08/0000
The year in which a vessel’s construction is completed.
1918
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Savannah Engineering & Construction Co
The port or place in which the vessel’s construction took place, at the time of writing.
Savannah
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 4; 5 HB 27/8/17
The date of first visit by a surveyor.
11/08/0000
Name of the individual/entity/organisation responsible for authoring the record
Hugh Boyle
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Skandia Pacific Oil Engineering Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Engine Forgings or Castings No 3; Manufactured by Cruse Crawford Manufacturing Co of Birmingham Ala
Name of ship as recorded on the record
Verdun
The process of transferring a vessel to water, but not necessarily her completion.
18/05/1918
Unique identifier for a given ship, it is assigned by a builder.
127
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
7 Engine Forgings or Castings
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
27/08/0000
Location where the document is written.
Jacksonville Fla
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Wood
Location of construction for a vessel’s engines.
Alameda Cala
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.