Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
21/03/1932
The year in which a vessel’s construction is completed.
1928
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cowpen Dry Docks & Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Blyth
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
3230
The port in which a vessel is registered or permanently based.
Newcastle
The date of first visit by a surveyor.
03/03/1932
The individual and/or organisation listed
Dalgliesh Steam Shipping Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
Robert G Knox; Arthur W Oxford
Location where a vessel’s survey was undertaken.
Piraeus
Date of the meeting of the Classing Committee.
12/04/1932
The name of the port/place of destination given.
Blyth
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Stockton
Blair & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine
Vessel’s area of loss or disposal/last known recorded location.
Coast of Spain
Recorded date for the vessel’s loss or disposal.
02/07/1940
Name of ship as recorded on the record
Isleworth
The process of transferring a vessel to water, but not necessarily her completion.
30/08/1928
Unique identifier for a given ship, it is assigned by a builder.
235
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Pir
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
15/03/1932
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
R S Dalgliesh Ltd
Location where the document is written.
Piraeus
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Deferred
Recorded information related to a vessel’s movements.
Piraeus; Blyth
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4919
Date in which construction of a vessel’s engines were completed.
1928
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk
21
The country or national waters where a vessel is lost/disposed of, or last recorded.
Spain
Physical extent of a record.
1