Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
24/03/1915
The year in which a vessel’s construction is completed.
1916
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Dundee Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Dundee
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 351, 440, 443
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
12/03/1915
Location where the document is written.
Sheffield
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Earles Ship Building & Engineering Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Engine Forgings No 1104; Manufactured by Moss & Gamble Bros of Sheffield
Name of ship as recorded on the record
Stock Force
The process of transferring a vessel to water, but not necessarily her completion.
22/11/1916
Unique identifier for a given ship, it is assigned by a builder.
243
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
7 Engine Forgings
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Hull 20836
The date of first visit by a surveyor.
02/02/1915
Name of the individual/entity/organisation responsible for authoring the record
Joseph Pringle
Name of surveyor.
Joseph Pringle
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Hull
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.