Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
29/06/1905
The year in which a vessel’s construction is completed.
1905
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cochrane & Sons Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Selby
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
3690
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Hartlepool 12626
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
29/06/1905
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
H Bagger
Location where the document is written.
Grimsby
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC; 6,05
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Ins Cylinder Triple Expansion Surface Condensing
Date in which construction of a vessel’s engines were completed.
1905
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1905
Physical extent of a record.
1
Name of ship as recorded on the record
Clitus
The process of transferring a vessel to water, but not necessarily her completion.
22/04/1905
Unique identifier for a given ship, it is assigned by a builder.
342
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gms
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
The listed port to which a given vessel belongs.
Grimsby
The date of first visit by a surveyor.
24/03/1905
The individual and/or organisation listed
Orient Steam Fishing Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
G D Ritchie
Location where a vessel’s survey was undertaken.
Grimsby
Date of the meeting of the Classing Committee.
11/07/1905
Physical arrangement of a ship’s masts, sails and rigging.
K - Ketch
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
240
Location of construction for a vessel’s engines.
Grimsby
Great Central Co-operative Engineering & Ship Repairing Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1905
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.