Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
08/11/1919
The year in which a vessel’s construction is completed.
1919
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Wear Concrete Building Co Ltd
Unique identifier for a given ship, it is assigned by a builder.
3
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Ferro-Concrete vessel
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
06/11/1919
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Sir E Glover
Name of the individual/entity/organisation responsible for authoring the record
John J B Wilson; T Shaw
Location where a vessel’s survey was undertaken.
Sunderland
Date of the meeting of the Classing Committee.
12/12/1919
The name of the port/place of destination given.
Coasting
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1919
Contextual information related to the reasons of the vessel’s loss or disposal.
She grounded on Wheathall Point when towing Creterock
Recorded date for the vessel’s loss or disposal.
09/10/1920
Physical extent of a record.
2
Name of ship as recorded on the record
Cretecable
The process of transferring a vessel to water, but not necessarily her completion.
17/07/1919
Name of the shipbuilder as it appears on the record.
W Denton
The port or place in which the vessel’s construction took place, at the time of writing.
Southwick, Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
27654
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
14/08/1918
The individual and/or organisation listed
The Shipping Controller
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J Murray
Location where the document is written.
Sunderland
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+A1 for Towing Purposes; Coasting U K (Except west Coast Cork to Pentland Firth) & Continent from Brest & Hamburg; Annual Survey; Experimental; Lloyd\'s A & CP; LMC 11,19
Recorded information related to a vessel’s movements.
Sunderland; Coasting
Broad categories and subdivisions of vessels related to their purpose or function.
Tug
Predominant material(s) utilised in a vessel’s construction.
Ferro-concrete
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
262
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
Wrecked
Vessel’s place of loss or disposal/last known recorded location.
Wheathall Point
1919
Pertinent, useful or interesting recorded content.
Also refers to Vessel Creterope
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.