Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

02/05/1922

The year in which a vessel’s construction is completed.

Year of ship completion

1915

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Aktien Gesellschaft Weser

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Bremen

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

75290

The port in which a vessel is registered or permanently based.

Port of registry

St. Ives

The date of first visit by a surveyor.

Date of first survey

15/02/1922

The individual and/or organisation listed

Ship owner

Hain Steam Ship Co Ltd

Name of the individual/entity/organisation responsible for authoring the record

Document author

J Robinson

Location where a vessel’s survey was undertaken.

Location of Survey

North Shields; South Shields

Date of the meeting of the Classing Committee.

Date of Classing committee

19/02/1926

The name of the port/place of destination given.

Destined voyage

Galveston; United States of America

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Bremen

Engine builder as written

A G Weser

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

The official record pronounced by the Committee

Loss or disposal

Broken up

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

__/__/0000

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Tredenham

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/__/1915

Unique identifier for a given ship, it is assigned by a builder.

Yard no

208

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Nwc

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Survey for Repairs, &c., of Engines & Boilers

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

01/03/1922

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Edward Hain & Son

Location where the document is written.

Location of Document Creation

Newcastle on Tyne

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

LMC 1,21; BS 3,22

Recorded information related to a vessel’s movements.

Voyage information

North Shields; South Shields; Galveston; United States of America

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

8435

Date in which construction of a vessel’s engines were completed.

Year of engine build

1915

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1922

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold for Breaking Up Purposes

Draft

1922

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.