Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
05/11/1928
The year in which a vessel’s construction is completed.
1907
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
R & W Hawthorn, Leslie & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
7319
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Gothenburg 7133
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
27/10/1928
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
G Carlsson
Location where the document is written.
Gothenburg
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Shelter dk with freeboard 4,28; SS Got No 3-7,20; SS Got No 2,28; +LMC; MS 4,28; BS 10,27; CL 4,28
The name of the port/place from which a vessel’s voyage originated.
Delagoa Bay
The name of the port/place of destination given.
Durban
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4010
Date in which construction of a vessel’s engines were completed.
1907
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Recorded date for the vessel’s loss or disposal.
__/__/0000
Name of ship as recorded on the record
Australic
The process of transferring a vessel to water, but not necessarily her completion.
13/08/1907
Unique identifier for a given ship, it is assigned by a builder.
421
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Got
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
The listed port to which a given vessel belongs.
Gothenburg
The date of first visit by a surveyor.
20/09/1928
The individual and/or organisation listed
Rederiaktieb Transatlantic
Name of the individual/entity/organisation responsible for authoring the record
E G Bernelius
Location where a vessel’s survey was undertaken.
Gothenburg
Date of the meeting of the Classing Committee.
27/11/1923
Recorded information related to a vessel’s movements.
Delagoa Bay; Durban
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Newcastle
Wallsend Slipway Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Work of Demolition Commenced
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.