Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
11/03/1912
The year in which a vessel’s construction is completed.
1902
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Sir Raylton Dixon & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Middlesbrough
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
67297
The listed port to which a given vessel belongs.
Liverpool
The date of first visit by a surveyor.
06/09/1911
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Elder Dempster & Co Ltd
Location where the document is written.
Liverpool
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Report attached
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Hartlepool
Richardsons Westgarth & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for breaking up purposes
The country or national waters where a vessel is lost/disposed of, or last recorded.
Belgium
Physical extent of a record.
1
Name of ship as recorded on the record
Akabo
The process of transferring a vessel to water, but not necessarily her completion.
24/12/1901
Unique identifier for a given ship, it is assigned by a builder.
482
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Liv
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5a Report on Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
05/03/1912
Name of the individual/entity/organisation responsible for authoring the record
James Carnaghan
Location where a vessel’s survey was undertaken.
Liverpool
Date of the meeting of the Classing Committee.
12/03/1912
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3814
Date in which construction of a vessel’s engines were completed.
1902
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Ghent
Recorded date for the vessel’s loss or disposal.
__/__/1936
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.