Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
20/05/1904
The year in which a vessel’s construction is completed.
1904
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Mackie & Thomson
Unique identifier for a given ship, it is assigned by a builder.
299
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
16/05/1904
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John McCorquodale
Location where the document is written.
Glasgow
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 (Steel); Lloyd's A & CP
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk by Collision
Vessel’s area of loss or disposal/last known recorded location.
Cromer Knoll
Recorded date for the vessel’s loss or disposal.
27/05/1929
Name of ship as recorded on the record
Main
The process of transferring a vessel to water, but not necessarily her completion.
28/04/1904
Name of the shipbuilder as it appears on the record.
Mackie Thomson
The port or place in which the vessel’s construction took place, at the time of writing.
Govan
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
21822
The listed port to which a given vessel belongs.
Cardiff
The date of first visit by a surveyor.
08/12/1903
The individual and/or organisation listed
Main Colliery Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
J McIlvenna
Location where a vessel’s survey was undertaken.
Glasgow
Date of the meeting of the Classing Committee.
30/05/1904
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
742
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Collision
The country or national waters where a vessel is lost/disposed of, or last recorded.
United Kingdom
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.