Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
10/02/1917
The year in which a vessel’s construction is completed.
1917
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Palmers Shipbuilding & Iron Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Jarrow on Tyne
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
69608
The listed port to which a given vessel belongs.
Liverpool
The date of last visit by a surveyor.
09/02/1917
Name of the individual/entity/organisation responsible for authoring the record
George Murdoch
Name of surveyor.
George Murdoch
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 2,17
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5856
Location of construction for a vessel’s engines.
Sunderland
G Clark Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking Up Purposes
Physical extent of a record.
1
Name of ship as recorded on the record
Lumina
The process of transferring a vessel to water, but not necessarily her completion.
05/08/1916
Unique identifier for a given ship, it is assigned by a builder.
853
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The individual and/or organisation listed
H E Moss & Co
Location where the document is written.
Newcastle on Tyne
Location where a vessel’s survey was undertaken.
Jarrow; North Shields
Date of the meeting of the Classing Committee.
20/02/1917
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion
Date in which construction of a vessel’s engines were completed.
1917
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Recorded date for the vessel’s loss or disposal.
__/__/0000
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.