Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

23/04/1935

The year in which a vessel’s construction is completed.

Year of ship completion

1922

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Hong Kong & Whampoa Dock Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Hong Kong

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

5644

The port in which a vessel is registered or permanently based.

Port of registry

London

The date of first visit by a surveyor.

Date of first survey

18/04/1935

The individual and/or organisation listed

Ship owner

Anglo Saxon Petroleum Co Ltd

Location where the document is written.

Location of Document Creation

Singapore

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

Deferred

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Location of construction for a vessel’s engines.

Location of engine build

Hong Kong

Engine builder as written

Hong Kong & Whampoa Dk Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold for breaking Up Purposes

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Planorbis

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

04/04/1922

Unique identifier for a given ship, it is assigned by a builder.

Yard no

582

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Sng

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Report of Survey for Repairs, &c., of Engines & Boilers

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

20/04/1935

Name of the individual/entity/organisation responsible for authoring the record

Document author

John Wormald

Location where a vessel’s survey was undertaken.

Location of Survey

Singapore

Date of the meeting of the Classing Committee.

Date of Classing committee

05/11/1935

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Date in which construction of a vessel’s engines were completed.

Year of engine build

1922

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

To be broken up

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

__/__/0000

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.