Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

12/11/1934

The year in which a vessel’s construction is completed.

Year of ship completion

1921

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

John Cran & Sommerville Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Leith

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Survey for Repairs, &c., of Engines & Boilers

The listed port to which a given vessel belongs.

Port belonging to

Liverpool

The date of first visit by a surveyor.

Date of first survey

06/11/1934

The individual and/or organisation listed

Ship owner

E Nicholson Ltd

Location where a vessel’s survey was undertaken.

Location of Survey

Garston

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Leith

Engine builder as written

J Cran & Somerville Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Has not been heard of

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

Irish Channel

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Dhoon Glen

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

27/01/1921

Unique identifier for a given ship, it is assigned by a builder.

Yard no

124

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

104632

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Liverpool 104000

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

06/11/1934

Name of the individual/entity/organisation responsible for authoring the record

Document author

R O Batchelor

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 8,33; SS Bkn No 3-8,33; +LMC MS 8,33; BS 10,33; TS CL 8,33

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

325

Date in which construction of a vessel’s engines were completed.

Year of engine build

1921

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Missing

Number of lives lost

7

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

27/01/1938

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.