Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
13/09/1929
The year in which a vessel’s construction is completed.
1930
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
The Greenock Dockyard Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Greenock
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Greenock 3298
The individual and/or organisation listed
Canadian American Shipping Co
Location where the document is written.
Greenock
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5400
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine
Recorded date for the vessel’s loss or disposal.
29/03/1943
Name of ship as recorded on the record
Melmay
The process of transferring a vessel to water, but not necessarily her completion.
09/06/1930
Unique identifier for a given ship, it is assigned by a builder.
419
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Request for Special Survey
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
Macranes
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
David Rowan & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Vessel’s place of loss or disposal/last known recorded location.
Africa
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.