Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
04/10/1908
The year in which a vessel’s construction is completed.
1908
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
J Priestman & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
27077
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
09/10/1908
Location where the document is written.
Glasgow
Location where a vessel’s survey was undertaken.
Annan
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Aircraft
The country or national waters where a vessel is lost/disposed of, or last recorded.
Spain
Physical extent of a record.
1
Name of ship as recorded on the record
Greenbatt
The process of transferring a vessel to water, but not necessarily her completion.
27/10/1908
Unique identifier for a given ship, it is assigned by a builder.
125
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5b Report on Boilers
The date of first visit by a surveyor.
20/08/1908
Name of the individual/entity/organisation responsible for authoring the record
James Mollison; R W Coomber
Name of surveyor.
James Mollison
Date of the meeting of the Classing Committee.
11/12/1908
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk; Refloated - Now Trading
Vessel’s place of loss or disposal/last known recorded location.
Barcelona
Recorded date for the vessel’s loss or disposal.
27/12/1938
Pertinent, useful or interesting recorded content.
Notation of 'Transmit To London' entered in classification
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.