Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1922
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Scheepswerf Voorheen Jan Smit Czn
The port or place in which the vessel’s construction took place, at the time of writing.
Alblasserdam
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
11b Surveys for Freeboard-Steam Ships
The port in which a vessel is registered or permanently based.
Copenhagen
The individual and/or organisation listed
Dampskibs Selskabal Dannebrog
Location where the document is written.
Rotterdam
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk (war loss)
Vessel’s area of loss or disposal/last known recorded location.
North Sea
Physical extent of a record.
1
Name of ship as recorded on the record
Christiansborg
The process of transferring a vessel to water, but not necessarily her completion.
14/09/1921
Unique identifier for a given ship, it is assigned by a builder.
483
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Rot
Additional numbers that feature on a given record that may be used for identification.
30254
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
R Leeuwenburg
Location where a vessel’s survey was undertaken.
Rotterdam
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3312
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Torpedoed
Recorded date for the vessel’s loss or disposal.
21/03/1940
Pertinent, useful or interesting recorded content.
Also refers to Vessel Sierrd Leone
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.