Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/03/1914
The year in which a vessel’s construction is completed.
1914
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Actien-Gesellschaft Weser
The port or place in which the vessel’s construction took place, at the time of writing.
Bremen
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
379
The listed port to which a given vessel belongs.
Bremen
The date of first visit by a surveyor.
23/04/1913
The individual and/or organisation listed
Deutsche Dampfs-fahrts Ges Hansa
Name of the individual/entity/organisation responsible for authoring the record
G H C Bahr
Location where a vessel’s survey was undertaken.
Bremen
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Bremen
Actien-Gesellschaft Weser
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk following a Collision
The country or national waters where a vessel is lost/disposed of, or last recorded.
United Kingdom
Physical extent of a record.
1
Name of ship as recorded on the record
Greiffenfels
The process of transferring a vessel to water, but not necessarily her completion.
10/02/1914
Unique identifier for a given ship, it is assigned by a builder.
201
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bmn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5a Report on Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
14/03/1914
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
H F Socken
Location where the document is written.
Bremen
Date of the meeting of the Classing Committee.
31/03/1914
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5852
Date in which construction of a vessel’s engines were completed.
1914
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk by Collision
Vessel’s area of loss or disposal/last known recorded location.
South Coast
Recorded date for the vessel’s loss or disposal.
12/02/1940
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.