Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
07/08/1928
The year in which a vessel’s construction is completed.
1928
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Swan, Hunter & Wigham Richardson Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Walker on Tyne
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
83138
The listed port to which a given vessel belongs.
Newcastle
The date of first visit by a surveyor.
17/02/1928
The individual and/or organisation listed
Confield Steam Ship Co Ltd
Location where the document is written.
Newcastle on Tyne
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 8,28 CL
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4632
Location of construction for a vessel’s engines.
Walker on Tyne
Swan Hunter & Wigham Richardson Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Missing
Physical extent of a record.
1
Name of ship as recorded on the record
Gracefield
The process of transferring a vessel to water, but not necessarily her completion.
04/07/1928
Unique identifier for a given ship, it is assigned by a builder.
1274
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Steam Reciprocating Engine Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
07/08/1928
Name of the individual/entity/organisation responsible for authoring the record
D MacFarlane; L G Shallcross
Location where a vessel’s survey was undertaken.
Wallsend on Tyne
Date of the meeting of the Classing Committee.
14/12/1928
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Direct Acting Surface Condensing
Date in which construction of a vessel’s engines were completed.
1928
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Missing
Recorded date for the vessel’s loss or disposal.
06/07/0000
Have you noticed missing or incorrect data or images for this document?