Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
02/08/1940
The year in which a vessel’s construction is completed.
1921
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harbour Marine Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Victoria, BC
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
53560
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Rotterdam 22266
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
01/08/1940
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
J Cory & Sons Ltd
Location where the document is written.
Cardiff
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Record Reclassification Contemplated Examined 8,40
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk (war loss)
Vessel’s area of loss or disposal/last known recorded location.
Atlantic
Physical extent of a record.
2
Name of ship as recorded on the record
Empire Volunteer
The process of transferring a vessel to water, but not necessarily her completion.
29/09/1920
Unique identifier for a given ship, it is assigned by a builder.
2
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Cff
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Survey for Repairs, &c.
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
21/06/1940
The individual and/or organisation listed
Ministry of Shipping
Name of the individual/entity/organisation responsible for authoring the record
H McG Richardson; C H Stocks
Location where a vessel’s survey was undertaken.
Cardiff
Date of the meeting of the Classing Committee.
09/08/1940
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5319
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Enemy Action
Recorded date for the vessel’s loss or disposal.
17/09/1940
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.