Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
29/10/1932
The year in which a vessel’s construction is completed.
1907
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Beardmore & Co Ltd
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hfs
Additional numbers that feature on a given record that may be used for identification.
19288
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Helsingfors
Location where a vessel’s survey was undertaken.
Helsingfors
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Stranded & sunk
Vessel’s place of loss or disposal/last known recorded location.
Borkum
Recorded date for the vessel’s loss or disposal.
28/02/1941
Name of ship as recorded on the record
Bore VIII
The process of transferring a vessel to water, but not necessarily her completion.
15/06/1907
The port or place in which the vessel’s construction took place, at the time of writing.
Dalmuir
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
C11 Surveys for Freeboard
The port in which a vessel is registered or permanently based.
Abo
Name of the individual/entity/organisation responsible for authoring the record
Ossian Tybeck
Name of surveyor.
Ossian Tybeck
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Shelter Dk with Freeboard S S Liv No3 - 8, 20 S S Daz No 2, 28
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5602
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Stranded & Sunk
The country or national waters where a vessel is lost/disposed of, or last recorded.
Germany
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.