Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
21/06/1902
The year in which a vessel’s construction is completed.
1902
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Hawthorns & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Leith
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
5705
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
21/06/1902
Name of the individual/entity/organisation responsible for authoring the record
Thomas L Thornton
Location where a vessel’s survey was undertaken.
Leith
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Aircraft
Recorded date for the vessel’s loss or disposal.
06/04/1941
Name of ship as recorded on the record
Surf
The process of transferring a vessel to water, but not necessarily her completion.
10/04/1902
Name of the shipbuilder as it appears on the record.
James Herdman
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lth
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
13 Report on Electric Lighting Installation
The date of first visit by a surveyor.
16/06/1902
The individual and/or organisation listed
Francis D Lambert Esq
Location where the document is written.
Leith
Physical arrangement of a ship’s masts, sails and rigging.
S - Ship
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
DC Chandler Compound Engine
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Vessel’s place of loss or disposal/last known recorded location.
Piraeus
Physical extent of a record.
1