Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
06/03/1908
The year in which a vessel’s construction is completed.
1908
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Workman, Clark & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 2491-2-3-4 PA
The date of first visit by a surveyor.
06/02/1908
Name of the individual/entity/organisation responsible for authoring the record
G Abel
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Belfast
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Torpedoed and Sunk
Vessel’s area of loss or disposal/last known recorded location.
North Atlantic
Physical extent of a record.
1
Name of ship as recorded on the record
Tainui
The process of transferring a vessel to water, but not necessarily her completion.
01/09/1908
Unique identifier for a given ship, it is assigned by a builder.
277
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
7 Engine Forgings
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
06/03/1908
Location where the document is written.
Dusseldorf
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Workman Clark & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Torpedoed & Presumed Sunk
Recorded date for the vessel’s loss or disposal.
22/02/1943
Pertinent, useful or interesting recorded content.
Engine Forgings No 6685; Manufactured by Haniel & Lueg of Dusseldorf
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.