Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/04/1906
The year in which a vessel’s construction is completed.
1906
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Swan Hunter & Wigham Richardson Ltd
Unique identifier for a given ship, it is assigned by a builder.
752
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
03/04/1906
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
George Arnold
Location where the document is written.
Newcastle on Tyne
Location where a vessel’s survey was undertaken.
Newcastle on Tyne
Date of the meeting of the Classing Committee.
06/04/1906
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1087
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Mine
Vessel’s area of loss or disposal/last known recorded location.
South East Coast
Physical extent of a record.
2
Name of ship as recorded on the record
Mersey
The process of transferring a vessel to water, but not necessarily her completion.
23/02/1906
Name of the shipbuilder as it appears on the record.
J Dunham Charstie
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle on Tyne
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
50478
The listed port to which a given vessel belongs.
Goole
The date of first visit by a surveyor.
16/10/1905
The individual and/or organisation listed
Lancastire & Yorkshire Railway Co
Name of the individual/entity/organisation responsible for authoring the record
B C Laws; James McNeil
Name of surveyor.
James McNeil
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyd\'s A & CP; +LMC 4,06; FD; Elec Light
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk (war loss)
14
Recorded date for the vessel’s loss or disposal.
20/04/1940
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.