Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/1921
The year in which a vessel’s construction is completed.
1921
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Bow McLachlan & Co Ltd
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Ship Forgings
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Glasgow 41131
The date of first visit by a surveyor.
11/02/1920
Name of the individual/entity/organisation responsible for authoring the record
William Campbell
Name of surveyor.
William Campbell
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Torpedoed & Sunk
Recorded date for the vessel’s loss or disposal.
27/03/1945
Pertinent, useful or interesting recorded content.
Ship Forgings No F17557; Manufactured by Clelands Graving Dock & Slipway Co Ltd of Willington Quay
Name of ship as recorded on the record
Maria Kyriakides
The process of transferring a vessel to water, but not necessarily her completion.
23/02/1921
The port or place in which the vessel’s construction took place, at the time of writing.
Paisley
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 5706N WC
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
01/02/1921
Location where the document is written.
Newcastle
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The country or national waters where a vessel is lost/disposed of, or last recorded.
United Kingdom
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.