Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1921
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Armstrong, Whitworth & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Walker
The port in which a vessel is registered or permanently based.
London
The individual and/or organisation listed
Lobitos Oilfields, Ltd
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 5,43; S S No 3-4,35; S S No 1-39; +LMC 5,43; TS 4,41 CL; Carrying Petroleum in bulk; Fitted for oil fuel 1,22 FP above 150F
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk in port
Recorded date for the vessel’s loss or disposal.
11/02/1944
Physical extent of a record.
1
Name of ship as recorded on the record
El Grillo
The process of transferring a vessel to water, but not necessarily her completion.
02/11/1921
Unique identifier for a given ship, it is assigned by a builder.
974
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Total Loss, Casualty, &c./ Wreck reports
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
C T Bowring & Co Ltd
Date of the meeting of the Classing Committee.
19/01/1944
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7264
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Bombed & Sunk in port
Recorded information relating the specific cargo being conveyed.
Carrying Petroleum in Bulk
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.