Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
24/07/1929
The year in which a vessel’s construction is completed.
1929
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Burntisland Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Burntisland
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
GR130 Vessels of 100 tons & upwards
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Llanelly
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Reciprocating Tri Compound Direct Acting Vertical
Date in which construction of a vessel’s engines were completed.
1929
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Aircraft
Physical extent of a record.
1
Name of ship as recorded on the record
Sarastone
The process of transferring a vessel to water, but not necessarily her completion.
06/07/1929
Unique identifier for a given ship, it is assigned by a builder.
154
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
LDPJ
The port in which a vessel is registered or permanently based.
Llanelly
The individual and/or organisation listed
The S & R Steamships Ltd
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2473
Location of construction for a vessel’s engines.
Sunderland
North Eastern Marine Engineering Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Recorded date for the vessel’s loss or disposal.
30/10/1941
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.