Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
16/05/1938
The year in which a vessel’s construction is completed.
1937
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harland & Wolff Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow
The port in which a vessel is registered or permanently based.
Fremantle
The individual and/or organisation listed
Western Australian Government
Location where the document is written.
Fremantle, W A
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Reciprocating Internal Combustion Direct Acting Vertical
Date in which construction of a vessel’s engines were completed.
1938
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Bombed & Beached
The country or national waters where a vessel is lost/disposed of, or last recorded.
Australia
Physical extent of a record.
1
Name of ship as recorded on the record
Koolama
The process of transferring a vessel to water, but not necessarily her completion.
16/12/1937
Unique identifier for a given ship, it is assigned by a builder.
10039
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
GR130 Vessels of 100 tons & upwards
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Jack Eggleston
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Motor Vessel
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4026
Location of construction for a vessel’s engines.
Glasgow
Harland & Wolff Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Vessel’s area of loss or disposal/last known recorded location.
West Coast of Australia
Recorded date for the vessel’s loss or disposal.
23/02/1942
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.