Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
20/12/1929
The year in which a vessel’s construction is completed.
1927
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Dublin Dockyard Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Dublin
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
1550a
The port in which a vessel is registered or permanently based.
Invercargill
The date of first visit by a surveyor.
09/12/1929
The individual and/or organisation listed
The Bluff Harbour Board N Z
Location where the document is written.
Dunedin
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Deferred
Recorded information related to a vessel’s movements.
Port Chalmers; Towing
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
525
Date in which construction of a vessel’s engines were completed.
1927
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
r 1929
Physical extent of a record.
1
Name of ship as recorded on the record
Southland
The process of transferring a vessel to water, but not necessarily her completion.
26/10/1926
Unique identifier for a given ship, it is assigned by a builder.
120
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Ddn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
14/12/1929
Name of the individual/entity/organisation responsible for authoring the record
A J Crawford
Location where a vessel’s survey was undertaken.
Port Chalmers
Date of the meeting of the Classing Committee.
03/09/1935
The name of the port/place of destination given.
Towing Purposes
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Ipswich
Vickers Petters Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1929
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.