Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

17/02/1934

The year in which a vessel’s construction is completed.

Year of ship completion

1905

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

William Gray & Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

West Hartlepool

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

17836

The port in which a vessel is registered or permanently based.

Port of registry

London

The date of first visit by a surveyor.

Date of first survey

16/02/1934

The individual and/or organisation listed

Ship owner

The Delta Steam Ship Co Ltd

Location where the document is written.

Location of Document Creation

Falmouth

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; SS Shl 2nd No 3-1,31

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

3245

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Also refers to vessel Farnham

Name of ship as recorded on the record

Ship name

Apollo

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

17/05/1905

Unique identifier for a given ship, it is assigned by a builder.

Yard no

705

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Fal

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

C11 Surveys for Freeboard

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

17/02/1934

Name of the individual/entity/organisation responsible for authoring the record

Document author

Arthur Scullard

Name of surveyor.

Surveyor

Arthur Scullard

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

14

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.