Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
15/09/1922
The year in which a vessel’s construction is completed.
1912
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Reiherst Schiffsbau A/G
Abbreviations of the names of ports with Lloyd’s Register survey offices.
B.As
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
12/09/1922
Name of the individual/entity/organisation responsible for authoring the record
F G B Smith
Location where a vessel’s survey was undertaken.
Rio Santiago
Date of the meeting of the Classing Committee.
23/02/1923
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Bahia Blanca
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1912
The port or place in which the vessel’s construction took place, at the time of writing.
Hamburg
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
7281
The listed port to which a given vessel belongs.
Buenos Aires
The date of first visit by a surveyor.
01/09/1922
The individual and/or organisation listed
Argentine Government
Location where the document is written.
Buenos Aires
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 with Fbd; S S No 3,9,22; LMC 1,12; BS 9,22; FD
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
9349
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.