Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
01/09/1942
The year in which a vessel’s construction is completed.
1941
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Gulf Shipbuilding Co
The port or place in which the vessel’s construction took place, at the time of writing.
Chickasaw
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
1925
The listed port to which a given vessel belongs.
Mobile, Al
The date of first visit by a surveyor.
15/11/1941
The individual and/or organisation listed
Waterman Steamship Corp
Location where the document is written.
Mobile
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
2 WTB (Spt) 500 lbs
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Lynn Mass
General Electric Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Vessel’s area of loss or disposal/last known recorded location.
Atlantic
Physical extent of a record.
1
Name of ship as recorded on the record
Fairport
The process of transferring a vessel to water, but not necessarily her completion.
15/11/1941
Unique identifier for a given ship, it is assigned by a builder.
1
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mob
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5c Report on Water Tube Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
15/06/1942
Name of the individual/entity/organisation responsible for authoring the record
T G Dodd
Location where a vessel’s survey was undertaken.
Chickasaw
Date of the meeting of the Classing Committee.
23/09/1942
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
6165
Date in which construction of a vessel’s engines were completed.
1942
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine
Recorded date for the vessel’s loss or disposal.
19/07/1942
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.