Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

17/03/1941

The year in which a vessel’s construction is completed.

Year of ship completion

1940

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Cammell Laird & Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Birkenhead

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

115811

The listed port to which a given vessel belongs.

Port belonging to

London

The date of first visit by a surveyor.

Date of first survey

05/04/1940

Name of the individual/entity/organisation responsible for authoring the record

Document author

H L Sutherst

Location where a vessel’s survey was undertaken.

Location of Survey

Birkenhead

Date of the meeting of the Classing Committee.

Date of Classing committee

08/04/1941

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

8138

Date in which construction of a vessel’s engines were completed.

Year of engine build

1941

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Submarine

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

25/03/1942

Name of ship as recorded on the record

Ship name

Empire Steel

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

04/12/1940

Unique identifier for a given ship, it is assigned by a builder.

Yard no

1055

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Liv

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

5a Report on Boilers

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

21/03/1941

Location where the document is written.

Location of Document Creation

Liverpool

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See Minute on FE Machinery Report

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Belfast

Engine builder as written

Harland & Wolff

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

United States Atlantic

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.