Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1922
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Bethlehem Shipbuilding Corp Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Baltimore
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 6,41; SS No 3-2,35; SS No 1-38; +LMC 10,38; BS 10,40; TS 6,41 CL; Carrying Petroleum in Bulk; Fitted for Fuel 10,22 FP above 150F
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Torpedoed & Sunk
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk
Name of ship as recorded on the record
Eocene
The process of transferring a vessel to water, but not necessarily her completion.
01/02/1922
Unique identifier for a given ship, it is assigned by a builder.
125
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Total Loss, Casualty, &c./ Wreck reports
The individual and/or organisation listed
Socony Vacuum Transportation Co Ltd
Date of the meeting of the Classing Committee.
30/06/1942
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4216
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Recorded date for the vessel’s loss or disposal.
23/05/1942
Physical extent of a record.
1