Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
02/01/1918
The year in which a vessel’s construction is completed.
1917
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Skinner & Eddy Corp
The port or place in which the vessel’s construction took place, at the time of writing.
Seattle, Washington
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
555
The listed port to which a given vessel belongs.
Seattle
The date of first visit by a surveyor.
06/09/1917
The individual and/or organisation listed
United States Shipping Board Emergency Fleet
Name of the individual/entity/organisation responsible for authoring the record
James Fowler
Location where a vessel’s survey was undertaken.
Seattle
Date of the meeting of the Classing Committee.
29/01/1918
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5700
Location of construction for a vessel’s engines.
Seattle
Puget Sound Machinery Depot
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Vessel’s area of loss or disposal/last known recorded location.
North Atlantic
Physical extent of a record.
1
Name of ship as recorded on the record
West Haven
The process of transferring a vessel to water, but not necessarily her completion.
01/11/1917
Unique identifier for a given ship, it is assigned by a builder.
10
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sea
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
20/12/1917
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
C J O Brien
Location where the document is written.
Seattle Washington U S A
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 12,17; Fitted for Oil Fuel 12,17 FP above 150 F
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion
Date in which construction of a vessel’s engines were completed.
1917
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine
Recorded date for the vessel’s loss or disposal.
05/11/1942
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.